Sunday, December 6, 2015


The stack in front with the plywood on top is 15 solar panels.  The rest of the boxes are batteries and equipment.  The long tube on the floor is the mounting racks.  It will be nice to get this stuff out of the shop!




Half of one door coming together.  Three more halves to go.


The frame rails have been rabbeted (notched) so the two "Humpert panels" drop in half the thickness of the frame. Another frame will be laminated on top of this, also recessed for the panels.

1 comment: